Day 2 – Trailer passes bill of good health

Unfortunately the Heathfield High boys on this day weren’t able to push the caravan off its base and other such slightly dramatic jobs but they again did a top job of getting in and doing what was needed in preparing the trailer for construction to start on the weekend.

02 pre build day 2

02 pre build day 2 (3)Groups of students worked on a variety of jobs. One group pulled apart the shell of the caravan stripping the metal from the vynal and styrofome cladding – which gives me hope that whatever we build will be stronger than that! Another group set about framing windows and the last group were on trailer detail of getting all the dirt and muck off the trailer and then applying antirust paint.

02 pre build day 2 (1)

We turned the trailer over onto its back to have a good look over it and also had a visit from an engineer who gave the trailer a general all clear which was a big relief. With the trailer on its back we gave it a good scratching on a few rust spots as well.

By the end of the day we also had a few frames measured and put together for the outside shelter for the toilet that will go on the back deck.

Again see the time-lapse of the day below and starting Saturday 24 May(tomorrow) we will have our band of building volunteers preparing the dance floor and start the building up!

 

Come join us for a look or get involved and see the Facebook page for more detail: https://www.facebook.com/groups/happysimplysa/

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s